Further Proposed Modifications to the North Hertfordshire Local Plan 2011- 2031

Search representations

Results for Mrs Christine Millard search

New search New search

Object

Further Proposed Modifications to the North Hertfordshire Local Plan 2011- 2031

ED224

Representation ID: 8806

Received: 22/06/2021

Respondent: Mrs Christine Millard

Number of people: 2

Representation Summary:

Objection to East of Luton Development (SP19)
We object to North Herts D C Local Plans proposed development of 2100 homes East of Luton required solely to meet a previously unmet need from Luton of 9,300 homes calculated in 2017 as argued in ED224 for the following reasons.

1 it is Valuable Green Belt land and no adequate exceptional circumstances exist

2 Luton’s house building greatly exceeds the 2017 forecast. Updated and assessed needs are now lower and unmet needs are reduced to around 2000

3 Luton’s unmet needs have already been more than covered by Central Beds as the designated best fit neighbour, with many already in build.

4 Luton’s failure to require adequate family housing from developers.

5 Pollution levels already greatly exceed government requirements and any further development exasperates this further

6 Totally inadequate infrastructure to support any development.

Full text:

Objection to East of Luton Development (SP19)
We object to North Herts D C Local Plans proposed development of 2100 homes East of Luton required solely to meet a previously unmet need from Luton of 9,300 homes calculated in 2017 as argued in ED224 for the following reasons.

1 it is Valuable Green Belt land and no adequate exceptional circumstances exist

2 Luton’s house building greatly exceeds the 2017 forecast. Updated and assessed needs are now lower and unmet needs are reduced to around 2000

3 Luton’s unmet needs have already been more than covered by Central Beds as the designated best fit neighbour, with many already in build.

4 Luton’s failure to require adequate family housing from developers.

5 Pollution levels already greatly exceed government requirements and any further development exasperates this further

6 Totally inadequate infrastructure to support any development.

For instructions on how to use the system and make comments, please see our help guide.