Further Proposed Modifications to the North Hertfordshire Local Plan 2011- 2031

Search representations

Results for Mr and Mrs Andrew and Ruth Millard search

New search New search

Object

Further Proposed Modifications to the North Hertfordshire Local Plan 2011- 2031

FM 010

Representation ID: 8695

Received: 19/06/2021

Respondent: Mr and Mrs Andrew and Ruth Millard

Number of people: 2

Representation Summary:

See attached representation for Barkway

Full text:

To my surprise I have received correspondence in respect of a planning application/proposal for a development in Barkway which is back on the agenda. I understood this was to be removed from the local plan as Barkway was no longer seen as a 'village for growth' as suggested by an NHDC Planning Officer in 2020.

I would like to register my objection to this proposed development.

Reason for objection:

1. Transparency of the Process
• There has been no public correspondence between the Inspector and NHDC on the Draft Schedule of Further Modifications, only NHDC’s assertion that the Inspector has agreed the Schedule of Further Modifications.
• The reasons for the Inspector’s decision not to accept NHDC’s request to exclude BK3 from the Local Plan has not been published.
• We have not had a fair or proportionate opportunity to put our case against the inclusion of Site BK3. We support NHDC’s request to remove site BK3 from their Local Plan

2. Enlarging BK3 to Include Hertfordshire Country Council’s (HCC) School Site
Examination Document ED175. This document says that including the school site in the housing allocation site BK3 is pragmatic. HCC have not requested this amendment. This decision may be practical for NHDC but if BK3 includes HCCs land, then there is a risk that more homes than the 140 allocated will be built on this site. The land is not required by HCC for a school. The HCC school site should not be part of housing site BK3.

3. Figures for Housing Allocations, Completions and Permissions
MM010/FM039 says the number of homes expected to be delivered in Barkway village in the Local Plan period is 208. There is no evidence given for this figure. The figure is critical because Barkway is identified as suitable to support higher levels of housing that Category A villages on the basis that the number of homes expected to be delivered is ‘more than 200’. The figures need to be justified. MM217/FM113 is a table showing new homes for the parish. The table is wrong. Red type shows the figures given in the modification. Blue shows a simple correction. However, the detail of how the figures were arrived at is not available so the figures need to be justified. Total allocated sites 173 160 homes Completions and permissions 31 57 homes Total allocated, completed and permitted 204 230 217 homes

4. S106 Contributions to Provide School Transport
The contribution from construction of new homes in Barkway is mentioned three times in the Schedule of Further Proposed Main Modifications. School transport is already provided, and BPC have been consulted on how S106 money should be spent for the benefit of the parish. If this modification was to remain in the Local Plan for a bus service between Barkway and Barley schools, Barley would be benefiting from development in Barkway.
MM215/FM111 (in relation to Policy BK2): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools”. We suggest this is deleted.
MM216/FM112 (in relation to Policy BK3): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools.” We suggest this is deleted.
MM219/FM114 (in relation to Paragraph 13.39): “Contributions to support sustainable travel between the two sites should be secured from new developments.” There are no developments proposed in Barley, only in Barkway and we suggest this is deleted.

Object

Further Proposed Modifications to the North Hertfordshire Local Plan 2011- 2031

ED175

Representation ID: 9648

Received: 19/06/2021

Respondent: Mr and Mrs Andrew and Ruth Millard

Number of people: 2

Representation Summary:

See attached representation for Barkway

Full text:

To my surprise I have received correspondence in respect of a planning application/proposal for a development in Barkway which is back on the agenda. I understood this was to be removed from the local plan as Barkway was no longer seen as a 'village for growth' as suggested by an NHDC Planning Officer in 2020.

I would like to register my objection to this proposed development.

Reason for objection:

1. Transparency of the Process
• There has been no public correspondence between the Inspector and NHDC on the Draft Schedule of Further Modifications, only NHDC’s assertion that the Inspector has agreed the Schedule of Further Modifications.
• The reasons for the Inspector’s decision not to accept NHDC’s request to exclude BK3 from the Local Plan has not been published.
• We have not had a fair or proportionate opportunity to put our case against the inclusion of Site BK3. We support NHDC’s request to remove site BK3 from their Local Plan

2. Enlarging BK3 to Include Hertfordshire Country Council’s (HCC) School Site
Examination Document ED175. This document says that including the school site in the housing allocation site BK3 is pragmatic. HCC have not requested this amendment. This decision may be practical for NHDC but if BK3 includes HCCs land, then there is a risk that more homes than the 140 allocated will be built on this site. The land is not required by HCC for a school. The HCC school site should not be part of housing site BK3.

3. Figures for Housing Allocations, Completions and Permissions
MM010/FM039 says the number of homes expected to be delivered in Barkway village in the Local Plan period is 208. There is no evidence given for this figure. The figure is critical because Barkway is identified as suitable to support higher levels of housing that Category A villages on the basis that the number of homes expected to be delivered is ‘more than 200’. The figures need to be justified. MM217/FM113 is a table showing new homes for the parish. The table is wrong. Red type shows the figures given in the modification. Blue shows a simple correction. However, the detail of how the figures were arrived at is not available so the figures need to be justified. Total allocated sites 173 160 homes Completions and permissions 31 57 homes Total allocated, completed and permitted 204 230 217 homes

4. S106 Contributions to Provide School Transport
The contribution from construction of new homes in Barkway is mentioned three times in the Schedule of Further Proposed Main Modifications. School transport is already provided, and BPC have been consulted on how S106 money should be spent for the benefit of the parish. If this modification was to remain in the Local Plan for a bus service between Barkway and Barley schools, Barley would be benefiting from development in Barkway.
MM215/FM111 (in relation to Policy BK2): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools”. We suggest this is deleted.
MM216/FM112 (in relation to Policy BK3): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools.” We suggest this is deleted.
MM219/FM114 (in relation to Paragraph 13.39): “Contributions to support sustainable travel between the two sites should be secured from new developments.” There are no developments proposed in Barley, only in Barkway and we suggest this is deleted.

Object

Further Proposed Modifications to the North Hertfordshire Local Plan 2011- 2031

MM 010 / FM 039

Representation ID: 9649

Received: 19/06/2021

Respondent: Mr and Mrs Andrew and Ruth Millard

Number of people: 2

Representation Summary:

See attached representation for Barkway

Full text:

To my surprise I have received correspondence in respect of a planning application/proposal for a development in Barkway which is back on the agenda. I understood this was to be removed from the local plan as Barkway was no longer seen as a 'village for growth' as suggested by an NHDC Planning Officer in 2020.

I would like to register my objection to this proposed development.

Reason for objection:

1. Transparency of the Process
• There has been no public correspondence between the Inspector and NHDC on the Draft Schedule of Further Modifications, only NHDC’s assertion that the Inspector has agreed the Schedule of Further Modifications.
• The reasons for the Inspector’s decision not to accept NHDC’s request to exclude BK3 from the Local Plan has not been published.
• We have not had a fair or proportionate opportunity to put our case against the inclusion of Site BK3. We support NHDC’s request to remove site BK3 from their Local Plan

2. Enlarging BK3 to Include Hertfordshire Country Council’s (HCC) School Site
Examination Document ED175. This document says that including the school site in the housing allocation site BK3 is pragmatic. HCC have not requested this amendment. This decision may be practical for NHDC but if BK3 includes HCCs land, then there is a risk that more homes than the 140 allocated will be built on this site. The land is not required by HCC for a school. The HCC school site should not be part of housing site BK3.

3. Figures for Housing Allocations, Completions and Permissions
MM010/FM039 says the number of homes expected to be delivered in Barkway village in the Local Plan period is 208. There is no evidence given for this figure. The figure is critical because Barkway is identified as suitable to support higher levels of housing that Category A villages on the basis that the number of homes expected to be delivered is ‘more than 200’. The figures need to be justified. MM217/FM113 is a table showing new homes for the parish. The table is wrong. Red type shows the figures given in the modification. Blue shows a simple correction. However, the detail of how the figures were arrived at is not available so the figures need to be justified. Total allocated sites 173 160 homes Completions and permissions 31 57 homes Total allocated, completed and permitted 204 230 217 homes

4. S106 Contributions to Provide School Transport
The contribution from construction of new homes in Barkway is mentioned three times in the Schedule of Further Proposed Main Modifications. School transport is already provided, and BPC have been consulted on how S106 money should be spent for the benefit of the parish. If this modification was to remain in the Local Plan for a bus service between Barkway and Barley schools, Barley would be benefiting from development in Barkway.
MM215/FM111 (in relation to Policy BK2): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools”. We suggest this is deleted.
MM216/FM112 (in relation to Policy BK3): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools.” We suggest this is deleted.
MM219/FM114 (in relation to Paragraph 13.39): “Contributions to support sustainable travel between the two sites should be secured from new developments.” There are no developments proposed in Barley, only in Barkway and we suggest this is deleted.

Object

Further Proposed Modifications to the North Hertfordshire Local Plan 2011- 2031

MM 217 / FM 113

Representation ID: 9650

Received: 19/06/2021

Respondent: Mr and Mrs Andrew and Ruth Millard

Number of people: 2

Representation Summary:

See attached representation for Barkway

Full text:

To my surprise I have received correspondence in respect of a planning application/proposal for a development in Barkway which is back on the agenda. I understood this was to be removed from the local plan as Barkway was no longer seen as a 'village for growth' as suggested by an NHDC Planning Officer in 2020.

I would like to register my objection to this proposed development.

Reason for objection:

1. Transparency of the Process
• There has been no public correspondence between the Inspector and NHDC on the Draft Schedule of Further Modifications, only NHDC’s assertion that the Inspector has agreed the Schedule of Further Modifications.
• The reasons for the Inspector’s decision not to accept NHDC’s request to exclude BK3 from the Local Plan has not been published.
• We have not had a fair or proportionate opportunity to put our case against the inclusion of Site BK3. We support NHDC’s request to remove site BK3 from their Local Plan

2. Enlarging BK3 to Include Hertfordshire Country Council’s (HCC) School Site
Examination Document ED175. This document says that including the school site in the housing allocation site BK3 is pragmatic. HCC have not requested this amendment. This decision may be practical for NHDC but if BK3 includes HCCs land, then there is a risk that more homes than the 140 allocated will be built on this site. The land is not required by HCC for a school. The HCC school site should not be part of housing site BK3.

3. Figures for Housing Allocations, Completions and Permissions
MM010/FM039 says the number of homes expected to be delivered in Barkway village in the Local Plan period is 208. There is no evidence given for this figure. The figure is critical because Barkway is identified as suitable to support higher levels of housing that Category A villages on the basis that the number of homes expected to be delivered is ‘more than 200’. The figures need to be justified. MM217/FM113 is a table showing new homes for the parish. The table is wrong. Red type shows the figures given in the modification. Blue shows a simple correction. However, the detail of how the figures were arrived at is not available so the figures need to be justified. Total allocated sites 173 160 homes Completions and permissions 31 57 homes Total allocated, completed and permitted 204 230 217 homes

4. S106 Contributions to Provide School Transport
The contribution from construction of new homes in Barkway is mentioned three times in the Schedule of Further Proposed Main Modifications. School transport is already provided, and BPC have been consulted on how S106 money should be spent for the benefit of the parish. If this modification was to remain in the Local Plan for a bus service between Barkway and Barley schools, Barley would be benefiting from development in Barkway.
MM215/FM111 (in relation to Policy BK2): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools”. We suggest this is deleted.
MM216/FM112 (in relation to Policy BK3): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools.” We suggest this is deleted.
MM219/FM114 (in relation to Paragraph 13.39): “Contributions to support sustainable travel between the two sites should be secured from new developments.” There are no developments proposed in Barley, only in Barkway and we suggest this is deleted.

Object

Further Proposed Modifications to the North Hertfordshire Local Plan 2011- 2031

MM 215 / FM 111

Representation ID: 9651

Received: 19/06/2021

Respondent: Mr and Mrs Andrew and Ruth Millard

Number of people: 2

Representation Summary:

See attached representation for Barkway

Full text:

To my surprise I have received correspondence in respect of a planning application/proposal for a development in Barkway which is back on the agenda. I understood this was to be removed from the local plan as Barkway was no longer seen as a 'village for growth' as suggested by an NHDC Planning Officer in 2020.

I would like to register my objection to this proposed development.

Reason for objection:

1. Transparency of the Process
• There has been no public correspondence between the Inspector and NHDC on the Draft Schedule of Further Modifications, only NHDC’s assertion that the Inspector has agreed the Schedule of Further Modifications.
• The reasons for the Inspector’s decision not to accept NHDC’s request to exclude BK3 from the Local Plan has not been published.
• We have not had a fair or proportionate opportunity to put our case against the inclusion of Site BK3. We support NHDC’s request to remove site BK3 from their Local Plan

2. Enlarging BK3 to Include Hertfordshire Country Council’s (HCC) School Site
Examination Document ED175. This document says that including the school site in the housing allocation site BK3 is pragmatic. HCC have not requested this amendment. This decision may be practical for NHDC but if BK3 includes HCCs land, then there is a risk that more homes than the 140 allocated will be built on this site. The land is not required by HCC for a school. The HCC school site should not be part of housing site BK3.

3. Figures for Housing Allocations, Completions and Permissions
MM010/FM039 says the number of homes expected to be delivered in Barkway village in the Local Plan period is 208. There is no evidence given for this figure. The figure is critical because Barkway is identified as suitable to support higher levels of housing that Category A villages on the basis that the number of homes expected to be delivered is ‘more than 200’. The figures need to be justified. MM217/FM113 is a table showing new homes for the parish. The table is wrong. Red type shows the figures given in the modification. Blue shows a simple correction. However, the detail of how the figures were arrived at is not available so the figures need to be justified. Total allocated sites 173 160 homes Completions and permissions 31 57 homes Total allocated, completed and permitted 204 230 217 homes

4. S106 Contributions to Provide School Transport
The contribution from construction of new homes in Barkway is mentioned three times in the Schedule of Further Proposed Main Modifications. School transport is already provided, and BPC have been consulted on how S106 money should be spent for the benefit of the parish. If this modification was to remain in the Local Plan for a bus service between Barkway and Barley schools, Barley would be benefiting from development in Barkway.
MM215/FM111 (in relation to Policy BK2): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools”. We suggest this is deleted.
MM216/FM112 (in relation to Policy BK3): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools.” We suggest this is deleted.
MM219/FM114 (in relation to Paragraph 13.39): “Contributions to support sustainable travel between the two sites should be secured from new developments.” There are no developments proposed in Barley, only in Barkway and we suggest this is deleted.

Object

Further Proposed Modifications to the North Hertfordshire Local Plan 2011- 2031

MM 216 / FM 112

Representation ID: 9652

Received: 19/06/2021

Respondent: Mr and Mrs Andrew and Ruth Millard

Number of people: 2

Representation Summary:

See attached representation for Barkway

Full text:

To my surprise I have received correspondence in respect of a planning application/proposal for a development in Barkway which is back on the agenda. I understood this was to be removed from the local plan as Barkway was no longer seen as a 'village for growth' as suggested by an NHDC Planning Officer in 2020.

I would like to register my objection to this proposed development.

Reason for objection:

1. Transparency of the Process
• There has been no public correspondence between the Inspector and NHDC on the Draft Schedule of Further Modifications, only NHDC’s assertion that the Inspector has agreed the Schedule of Further Modifications.
• The reasons for the Inspector’s decision not to accept NHDC’s request to exclude BK3 from the Local Plan has not been published.
• We have not had a fair or proportionate opportunity to put our case against the inclusion of Site BK3. We support NHDC’s request to remove site BK3 from their Local Plan

2. Enlarging BK3 to Include Hertfordshire Country Council’s (HCC) School Site
Examination Document ED175. This document says that including the school site in the housing allocation site BK3 is pragmatic. HCC have not requested this amendment. This decision may be practical for NHDC but if BK3 includes HCCs land, then there is a risk that more homes than the 140 allocated will be built on this site. The land is not required by HCC for a school. The HCC school site should not be part of housing site BK3.

3. Figures for Housing Allocations, Completions and Permissions
MM010/FM039 says the number of homes expected to be delivered in Barkway village in the Local Plan period is 208. There is no evidence given for this figure. The figure is critical because Barkway is identified as suitable to support higher levels of housing that Category A villages on the basis that the number of homes expected to be delivered is ‘more than 200’. The figures need to be justified. MM217/FM113 is a table showing new homes for the parish. The table is wrong. Red type shows the figures given in the modification. Blue shows a simple correction. However, the detail of how the figures were arrived at is not available so the figures need to be justified. Total allocated sites 173 160 homes Completions and permissions 31 57 homes Total allocated, completed and permitted 204 230 217 homes

4. S106 Contributions to Provide School Transport
The contribution from construction of new homes in Barkway is mentioned three times in the Schedule of Further Proposed Main Modifications. School transport is already provided, and BPC have been consulted on how S106 money should be spent for the benefit of the parish. If this modification was to remain in the Local Plan for a bus service between Barkway and Barley schools, Barley would be benefiting from development in Barkway.
MM215/FM111 (in relation to Policy BK2): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools”. We suggest this is deleted.
MM216/FM112 (in relation to Policy BK3): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools.” We suggest this is deleted.
MM219/FM114 (in relation to Paragraph 13.39): “Contributions to support sustainable travel between the two sites should be secured from new developments.” There are no developments proposed in Barley, only in Barkway and we suggest this is deleted.

Object

Further Proposed Modifications to the North Hertfordshire Local Plan 2011- 2031

MM 219 / FM 114

Representation ID: 9653

Received: 19/06/2021

Respondent: Mr and Mrs Andrew and Ruth Millard

Number of people: 2

Representation Summary:

See attached representation for Barkway

Full text:

To my surprise I have received correspondence in respect of a planning application/proposal for a development in Barkway which is back on the agenda. I understood this was to be removed from the local plan as Barkway was no longer seen as a 'village for growth' as suggested by an NHDC Planning Officer in 2020.

I would like to register my objection to this proposed development.

Reason for objection:

1. Transparency of the Process
• There has been no public correspondence between the Inspector and NHDC on the Draft Schedule of Further Modifications, only NHDC’s assertion that the Inspector has agreed the Schedule of Further Modifications.
• The reasons for the Inspector’s decision not to accept NHDC’s request to exclude BK3 from the Local Plan has not been published.
• We have not had a fair or proportionate opportunity to put our case against the inclusion of Site BK3. We support NHDC’s request to remove site BK3 from their Local Plan

2. Enlarging BK3 to Include Hertfordshire Country Council’s (HCC) School Site
Examination Document ED175. This document says that including the school site in the housing allocation site BK3 is pragmatic. HCC have not requested this amendment. This decision may be practical for NHDC but if BK3 includes HCCs land, then there is a risk that more homes than the 140 allocated will be built on this site. The land is not required by HCC for a school. The HCC school site should not be part of housing site BK3.

3. Figures for Housing Allocations, Completions and Permissions
MM010/FM039 says the number of homes expected to be delivered in Barkway village in the Local Plan period is 208. There is no evidence given for this figure. The figure is critical because Barkway is identified as suitable to support higher levels of housing that Category A villages on the basis that the number of homes expected to be delivered is ‘more than 200’. The figures need to be justified. MM217/FM113 is a table showing new homes for the parish. The table is wrong. Red type shows the figures given in the modification. Blue shows a simple correction. However, the detail of how the figures were arrived at is not available so the figures need to be justified. Total allocated sites 173 160 homes Completions and permissions 31 57 homes Total allocated, completed and permitted 204 230 217 homes

4. S106 Contributions to Provide School Transport
The contribution from construction of new homes in Barkway is mentioned three times in the Schedule of Further Proposed Main Modifications. School transport is already provided, and BPC have been consulted on how S106 money should be spent for the benefit of the parish. If this modification was to remain in the Local Plan for a bus service between Barkway and Barley schools, Barley would be benefiting from development in Barkway.
MM215/FM111 (in relation to Policy BK2): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools”. We suggest this is deleted.
MM216/FM112 (in relation to Policy BK3): “Contribution towards travel by sustainable modes of transport between Barley and Barkway schools.” We suggest this is deleted.
MM219/FM114 (in relation to Paragraph 13.39): “Contributions to support sustainable travel between the two sites should be secured from new developments.” There are no developments proposed in Barley, only in Barkway and we suggest this is deleted.