Object
Local Plan 2011-2031 Proposed Submission Draft
Representation ID: 4308
Received: 28/11/2016
Respondent: Save Rural Baldock Group
Number of people: 3
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Representation Summary:
Objection to SP7 in relation to BA1, BA3 and BA4:
- There is no detailed plans on which the viability of the sites can be assessed.
- Major decisions have been postponed until the Masterplan and there are serious likelihood that the site will be proved to be undeliverable in the plan period.
- not consistent with national policy,not assessed the costs of providing the necessary infrastructure and assumes that costs will be met by developers.
Full text:
See attachment