Object
Local Plan 2011-2031 Proposed Submission Draft
Representation ID: 1781
Received: 30/11/2016
Respondent: Mrs Ann Whittenham
Legally compliant? No
Sound? No
Duty to co-operate? No
Representation Summary:
Objection to KB2 on the grounds of:
- lack of suitable infrastructure
- access via the three railway bridges inadequate
- road widening would be needed
Full text:
My principal objection to the proposed development is the lack of suitable infrastructure in and around Knebworth. Access via the 3 railway bridges connecting Knebworth to the B197 is completely inadequate for the existing residents let alone an increased number of householders.