Object

Local Plan 2011-2031 Proposed Submission Draft

Representation ID: 1509

Received: 30/11/2016

Respondent: Mr Nick Muir

Legally compliant? No

Sound? No

Duty to co-operate? Yes

Representation Summary:

Object to SP2:
- The inclusion of the land SP2 in the draft local plan and the change to the village boundary at an unacceptably late stage is not legally compliant.

Full text:

The last minute addition of the site SP2 to the draft local plan and the redrawing of the village boundary to accommodate it clearly contravenes the code of conduct laid down in the National Planning and Policy Framework. This states that proper and true community consultation must be made before taking this type of decision and that said consultation should include local neighbourhoods, businesses and organisations. This has manifestly not been the case given the time scale involved. The local plan has been in the draft stage for the last several years and to introduce this change a matter of weeks before the consultation closes completely goes against the spirit of the NPPF with regards to changes and adoptions of this kind.
SP2 has long been allocated as green belt in the draft local plan, this was fully supported by the local community. To change the status of the site by redrawing the village boundary at this late stage clearly goes against National policy and as such is not legally compliant.

Attachments: