Object
Local Plan 2011-2031 Proposed Submission Draft
Representation ID: 1316
Received: 29/11/2016
Respondent: Mrs Abigail Rawling
Legally compliant? No
Sound? No
Duty to co-operate? No
Representation Summary:
The issues surrounding the railway bridge at Gun Lane have not been addressed. There will be no green belt buffer between Gypsy Lane and the motorway. The drainage issue has not been addressed. An overall strategy needs to be in place to address all of these issues.
Full text:
The issues surrounding the railway bridge at Gun Lane have not been addressed. There will be no green belt buffer between Gypsy Lane and the motorway. The drainage issue has not been addressed. An overall strategy needs to be in place to address all of these issues.