Object

Local Plan 2011-2031 Proposed Submission Draft

Representation ID: 1126

Received: 28/11/2016

Respondent: Mr A Smith

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Objection to KB1 on the grounds of:
- Removal of green belt buffer to the village of Knebworth
- Increased noise and pollution from A1(M)
-Traffic congestion through narrow railway bridges and impact to wider traffic congestion in and around the village
- Viability of the land given flooding issues associated with large areas of proposed land.
- Joined up thinking needed to provide long term sustainable development.
- A strategic, long term plan should be fully considered co-operating with wider planning policy enhancing facilities, employment and providing sustainable solutions.

Full text:

Removal of green belt buffer to the village of Knebworth

Increased noise and pollution from A1(M)

Traffic congestion through narrow railway bridges and impact to wider traffic congestion in and around the village

Viability of the land given flooding issues associated with large areas of proposed land.

Housing for housing sake is not planning policy. Incremental additional housing is not fulfilling the amenity needs and joined up thinking needed to provide long term sustainable development. The proposals are simply box ticking to hit housing targets having no regard for the wider implications and planning needs or support.