Object

Local Plan 2011-2031 Proposed Submission Draft

Representation ID: 1005

Received: 27/11/2016

Respondent: Mr William Kirby

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Object to KB3: sustainability of Knebworth as a place to live and work, ignores infrastructure, fails to recognise the nature and character of the town, no provision to addreess transport and road issues that exist today, loss of employment

Full text:

Whilst many will welcome the opportunity to reduce congestion in the centre of the village this plan takes no account of the total lack of any employment proposition. As such the specific section relating to KB3 further reduces the sustainability of Knebworth as a self-contained village supporting employmen. Further increasing housing stock in the centre of the village simply adds to the pressures proposed elsewhere in the plan replacing one set of access challenges with another. There is no evidence that developing the centre of the village takes into account any cooperation between the needs of locals (additional infrastructure) transport (servicing the needs of the new residents) utilities (water drainage et cetera) and the desire of the plan to deliver more housing.