MM185 - Page 123 Policy NE10 (ED156)

Showing comments and forms 1 to 2 of 2

Support

Proposed Main Modifications

Representation ID: 6750

Received: 24/01/2019

Respondent: Anglian Water Services Ltd

Representation Summary:

Anglian Water welcomes the proposed modification to Policy NE10 to include reference to applicants demonstrating that capacity is available both within the foul sewerage network and receiving Water Recycling Centre or can be available in time to serve the development. The proposed wording is consistent with that suggested by Anglian Water as part of our response to the Proposed Submission Local Plan and included in the agreed Memorandum of Understanding with Anglian Water (examination document MOU2).

This modification addresses our previous concerns relating to Policy NE10 of Proposed Submission Local Plan.

Full text:

Anglian Water welcomes the proposed modification to Policy NE10 to include reference to applicants demonstrating that capacity is available both within the foul sewerage network and receiving Water Recycling Centre or can be available in time to serve the development. The proposed wording is consistent with that suggested by Anglian Water as part of our response to the Proposed Submission Local Plan and included in the agreed Memorandum of Understanding with Anglian Water (examination document MOU2).

This modification addresses our previous concerns relating to Policy NE10 of Proposed Submission Local Plan.

Object

Proposed Main Modifications

Representation ID: 6860

Received: 28/01/2019

Respondent: Rumball Sedgwick

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

See attached. Policies add nothing 'local' to North Herts, are unnecessary and should therefore be deleted.

Full text:

See attached

Attachments: